|
||||
|
|
OOTP Mods - Schedules Create your very own game schedules, or share historical schedules |
|
Thread Tools |
04-16-2020, 07:03 PM | #1 | |
Minors (Single A)
Join Date: Mar 2018
Location: Toronto, Canada
Posts: 64
|
Error: Loaded Schedule Has a Different Structure
Hi,
I have been working on a custom league for quite a while now, and I have two leagues, each with a custom schedule. The one league loads fine. The other league I am getting this error : Quote:
I have a simple 162 game, 10 team league in a single division. I've checked the lsdl file a number of times and can't see anything wrong with it. Is there some way where I can "loosen" what the game is looking for? I have attached the file if anyone is able to glance at it and can maybe see something that I am missing. I am running XX btw. Thanks in advance for even looking at this, Michael
__________________
Commissioner : Skyline Baseball League (2005-2032) Los Angeles Dodgers GM : Skyline League (2000-2028) Memphis Blues GM : Skyline League (2030-2032) Colorado Rockies GM : Skyline League (2037-present) Bloordale Benedicts GM : National Dynasty League (2087-present) |
|
04-16-2020, 09:00 PM | #2 |
Minors (Single A)
Join Date: Mar 2018
Location: Toronto, Canada
Posts: 64
|
And I figured this out. The type in the schedule tag was incorrectly formatted. All good now.
NOTHING TO SEE HERE!! Cheers, Michael
__________________
Commissioner : Skyline Baseball League (2005-2032) Los Angeles Dodgers GM : Skyline League (2000-2028) Memphis Blues GM : Skyline League (2030-2032) Colorado Rockies GM : Skyline League (2037-present) Bloordale Benedicts GM : National Dynasty League (2087-present) |
04-17-2020, 10:20 AM | #3 |
Hall Of Famer
Join Date: Jun 2008
Location: Belchertown, MA, USA
Posts: 4,447
|
For future reference, you can copy and paste the schedule tag from a working schedule with the same parameters.
|
04-20-2020, 08:53 AM | #4 |
Hall Of Famer
Join Date: Jun 2011
Posts: 3,630
|
Always good advice. Or else have the in-game scheduler create a schedule that fits your parameters, download that schedule, copy the header from that schedule into your schedule, and then import your schedule. That usually works for me.
|
Bookmarks |
|
|