Quote:
Originally Posted by Hageneezz
What do you use to create schedules?
|
Everyone has their own way of doing it, but I do mine in a blank Excel sheet. First, schedule one series at a time, just focusing on opponents first and choosing home and away teams after every team's schedule is filled. Then, decide on the length of each series (if every series is the same length, as it was in this schedule, then this part is trivial). This might force some rearrangement in the previous steps if I accidentally force a team to play 4 four-game series in a row or something. Then, using some Excel formula coding, I can translate that grid into the right XML format.