Quote:
Originally Posted by Braden
When I load the pre-configured game, 1994 it loads with a schedule starting in August 1994 instead of the start of the 1994 season. Of course, I can't re-do the schedule as it after the start of the regular season.
|
This is working as intended. The quickstart is just meant to allow you to do a what if replay of 1994 from the point were the strike happened and the season stopped through the rest of the year.
If you want to play 1994 from the beginning of the season, then you'd just load a regular historical db game in 1994.