|
Changes to the schedule generation
So I was editing a schedule in Xcode and I realized that the game does something that I do when making a schedule. Instead of figuring out how to add off days for teams while still having league games, it just adds league days where everyone is off. If we could edit that in-game, it would be incredible and would save some people loads of time.
I use an 84 game season. A default generated schedule would make the season 91 days long. In my league, I want a 104 day season. To do this, I have to use an editor and shift line by line every game day down so that I have a league day off every 4-6 days. It's the easiest way to do this.
If the game had an option to set a season length, where it would automatically add those league days off, it would probably be the best fictional-minded feature in years! You could set a season length, or even certain days off, like every Sunday for example.
I hope I made my idea clear. I think it would be easy to pull off (the game already does this on its own) and it would be an incredible customization tool.
|